Sprinkler Blowouts For Sunday, November 8, 2020

IMPORTANT UPDATE:

Jesse’s rig broke down today after doing his first blowout.  He is down for the day, so the route will resume on Monday.

END OF UPDATE

We have done sprinkler blowouts seven days a week during the season for several years, but this year we decided to leave weekends for an opportunity to rest since the weekdays are so hectic.  All of our technicians work 50+ hours per week. Jesse wants to get as much overtime as possible, and even though it costs us a lot of money for these extra hours he makes up for it in productivity and quality on the job.

We are only 124 completed blowouts away from matching what our total blowouts were in 2019.  We have done more than 600 blowouts this year than we completed last year at this time, and we still have 3-4 weeks to go before we end our season and not take any new blowouts.

Today Jesse will be working in the Boise 83709 with “Orange Julius” doing 18-20 sprinkler blowouts.  Monday we will have 4 rigs in the Boise 83709 and take care of anywhere between 75-80 blowouts.  Here is the route for today:

Boise 83709 – “Orange Julius”

W Franklin Rd
S Cole Rd
W Ashland Dr
W Fernwood Dr
W Hummel Dr
W Fairfield Ave
Franklin Park Cir
S Franklin Park Dr
W Tahoe Dr
Cassia St
S Newport St
S Rand St
W Dorian St
W Cedarwood Dr
Cedarwood Dr
Candlewood Dr
W Donnybrook Dr
W Mornin Mist St
W Wave Court – Meridian 83646 (Ran out of time on Friday)

Previous Post

Sprinkler Blowouts For Monday, November 9, 2020

Next Post

Sprinkler Blowouts For Friday, November 6, 2020

Leave a Reply

Your email address will not be published. Required fields are marked *

11 visitors online now
0 guests, 11 bots, 0 members
Max visitors today: 12 at 06:17 am UTC
This month: 37 at 12-03-2024 02:02 pm UTC
This year: 185 at 10-28-2024 07:22 am UTC
All time: 185 at 10-28-2024 07:22 am UTC