We finished sprinkler blowouts in all areas except the Boise 83713 and Nampa yesterday. Not a bad day considering we had three locations that required repairs, or piping being cut off to perform the blowout. We purposely saved those blowouts for our last few days out so we wouldn't get further behind.
I will take care of the three remaining in the Boise 83713 in the morning, and then head to Nampa. We have 5 blowouts to finish in Nampa, but two of them right next door to each other will require more corroded pipe removal before the blowout can continue.