Sprinkler Blowout To Resume In The Meridian 83642 Area On Saturday – November 29

We finished up the sprinkler blowouts remaining  on our Meridian 83646 list on Friday, and also finished almost half of the remaining blowouts in the Meridian 83642 that are on our list.

Today we will work again in the Meridian 83642, but because of a previously scheduled family obligation this morning we may not get to all of the 13 sprinkler blowouts remaining in the area.  We are going to work our hardest to get all, or as many of them as possible.  Sunday we will finish any remaining sprinkler blowouts in Meridian and then head to Kuna.  If Kuna sprinkler blowouts aren't finished on Sunday we will pick them up Monday and then finish our Nampa list.

I need to be totally finished with sprinkler blowouts by Monday so I can get moving on several repair requests I need to finish. Having your checks ready will help us out a lot.

Previous Post

Only Two More Days Of Sprinkler Blowouts

Next Post

Sprinkler Blowouts Will Resume On Friday – November 27

Leave a Reply

Your email address will not be published. Required fields are marked *

9 visitors online now
0 guests, 9 bots, 0 members
Max visitors today: 15 at 06:30 am UTC
This month: 37 at 12-03-2024 02:02 pm UTC
This year: 185 at 10-28-2024 07:22 am UTC
All time: 185 at 10-28-2024 07:22 am UTC